Pump Stations (#2 at Town Garage, #3 at High School, #4 at Loon Lake Road): • Install outdoor-rated, 3-phase, 200-amp manual transfer switch. • Install 150-amp pin and sleeve generator outlet on the building’s exterior. Sewer Treatment Plant: • Install indoor-rated, 3-phase, 200-amp manual transfer switch (within generator building). • Install 150-amp pin and sleeve generator outlet on the exterior of the building. Main Street Pump Station: • Install indoor-rated, 3-phase, 200-amp manual transfer switch inside the building. • Install 150-amp pin and sleeve outlet outside the building, near the rear door. Additional Tasks: • Fabricate one (1) 25-foot, 150-amp flexible generator power cord. • Replace the existing 400-amp breaker on the generator with a 150-amp breaker.