1. BASE BID. The Reiche School Playground Project includes site improvements associated with a playground reconstruction project. Work will include, but is not limited to, the following: • All demolition and site preparation work as indicated on the plans. • Earthwork, including preparation of new playground areas, new stone dust area, and minor grading associated with the playground improvements. • Stormwater improvements, including underdrain systems, storm drainpipe, and basin connections. • Placing reclaimed granite curbing and features (provided by City on-site) as indicated on the plans. • Relocating and setting existing landscape boulders on site. • Providing, constructing / installing timber and log edging, stepping logs, boardwalk, and wood bench features. • Constructing asphalt, stone dust, and sand areas / paths. • Furnishing and installing aluminum fencing, including 3 swing gates for service and pedestrian access. • Preparing base aggregate, as required, for new playground equipment (by others) as indicated on the plans, including any required coordination with the City’s playground equipment installers. City shall provide wood playground safety surfacing • Furnishing and installing basketball hoop including asphalt painted lines and additional painted games. • Preparing new planting beds, providing and installing all landscaping including mulch placement. • Preparing lawn areas with loam and installing sod; Loaming & seeding all remaining disturbed areas, including the application of straw mulch.