This project will provide Antiterrorism (AT) features and comply with AT regulations, and physical security mitigation in accordance with DoD Minimum Antiterrorism Standards for Buildings. This project includes an entry control facility (ECF) that includes an entry control point fence, a guard and truck inspection office, a main entry canopy and a restricted area security fence. The entry control point fence includes a chain link security fence and sliding gates. The double lane main entry canopy will be used for identification checks and is comprised of concrete structural elements and an exposed steel canopy structure. The guard and truck inspection office will be adjacent to the main entry canopy. The project also constructs a security fence and installation of cameras/radars throughout the installation.