The Work involves the construction of a new PreK-1 School, an addition and renovations to the Mabel I Wilson School, and various campus site improvements at location indicated on Drawings. Work includes but is not limited to, selective demolition, earthwork, site utilities and site improvements, paving and landscaping. Work also includes concrete foundations and slab-on-grade, steel structure, steel joists and decking, roof membrane over roof insulation, masonry, metal stud partitions, metal siding, insulation, gypsum board walls and ceilings, acoustical ceilings, resilient flooring, ceramic tiling, carpeting, custom cabinets and fixtures, carpentry, glass storefront system, metal doors, wood doors, metal frames, door hardware, painting, toilet accessories, foodservice equipment, gymnasium equipment, signage, folding panel partitions, fire protection and detection systems, security systems, electrical, and heating, ventilating, and air conditioning complete and ready for use.