Apartment #1 and #2, Bathroom Ventilation: 10/18/2024 • Add: Add a ventilation fan to bathroom with it's own switch. Follow all Local and State Electrical Codes. Floors: • Enclosure: Prepare surface by removing any obstructions and repair damage for attaching the new enclosure. New Floor shall be installed starting with 1/4" Luan underlayment or approved equal and floor leveler to fill all seams and fastener holes to prevent dust migration and prepare the surface. Walls: • Enclosure: Prepare surface by removing obstructions and repair damage for attaching the new enclosure. She·etrock Mud/Tape (minimum 3/8" thickness)·shall be installed with mechanical fasteners to cover the Lead Paint Hazard. Seams shall be mud and taped three (3) coats. Install Lead Free baseboard and trim as needed to complete. Primed and painted two {2} finish coats. Materials and colors to be agreed upon by owner in writing and noted on the (tesign spe�ifications. Electrical Fixtures in good condition shall be loosened (as necessary) and re-secured through the enclosure material installed. Fixture replacement shall be the owner's responsibility. Handrail: • Remove and Replace: Install new handrails to front and rear stairs. New handrails will be installed on one side of stairs. Handrails shall not be less than 34" or more than 38" above the surface of the tread, measured vertically to the top of the rail from the leading edge of the tread. Handrails shail be installed to provide a clearance ofnot less than 2 ¼" between the handrail and the wall to which it is fastened and be continuously graspable along their entire length. Handrails shall have a circular cross section with an outside dimension of not less than 1 ¼" and not more than 2". New handrail ends shall be returned to the wall or shall ,ermL�ate at newel posts. RearStairwell: - Install: 20 Minute Fire Rated Door: {Bl- Rear Stairwell 1st, 2nd & 3rd floors} Remove and Replace by installing a 20 Minute Fire Rated Door. Installation to include ANSI Grade 2, keyed alike lockset/deadbolt. Door will be Energy Star compliant for the Northeast Region. Doors into a private unit require lockset with deadbolt properly installed. {Configuration to match existing if owner chooses to re-use existing locksets}. Install per manufacturer instructions, including caulking. Insulate door cavity using spray foam insulation. {MUBEC requires gaps are sealed}. Install non-leaded door casing to match existing. New trim components to be caulked, primed and painted to match existing, or color agreed upon by owner. No trim components shall be left unfinished. Smoke Detectors: - Install: Install hard wired-interconnected fire alarms to rear Stairwell. Follow all local and state electrical codes.