Specifications include, but are not limited to: the complete and satisfactory construction of landscaped areas at the park as shown on the project’s plan set. The landscaping includes removal and disposal of existing lawn and pavement areas, construction of hardscape, and planting beds. Construction includes Portland cement concrete slabs, cobble paving, brick paving, brick seat wall/planting beds, Portland cement concrete walkways, granite curbing, accessible ramps with detectable warnings, electrical conduit, lighting, irrigation, drainage, benches, trash receptacles, planters. Landscape planting, including furnishing and installing 15-gallon trees, 1-gallon perennial grasses and grass seed. The total project area is approximately 17,000 square feet.