Inspection and testing for the following building systems: St. Croix Hall Lower Dormitory Administration Building Upper Dormitory Heavy Equipment Each system to be tested per NFPA 72 requirements to include: 1. Test all functions and voltages of control equipment. 2. Test alarm, trouble, ground fault, and supervisory functions. 3. Test functionality of each initiating device. 4. Test sensitivity of each smoke detector. This test to be performed using equipment and Methods approved by detector manufacturer or NFPA (Simply administering an unmeasured amount of test gas does not meet NFPA requirements). 5. Test all batteries. 6. Provide written report for all test results. 7. Provide written report of all discovered deficiencies. 8. Provide follow-up service to repair any discovered deficiencies (at owner’s request). 9. All devices (100%) must be checked annually. State the number and frequency of Inspections (ex: quarterly). Vendor must provide all necessary staging for accessing devices.