Specifications include, but are not limited to:. Work under this project includes, but is not limited to, all labor, materials, equipment, and incidentals for the upgrade of the Town of Lisbons Davis Street Pump Station and Wastewater Treatment Plant Chlorine Contact Tank including general conditions and mobilization, temporary construction facilities, demolition and site clearing; structural excavation, trench excavation, ledge excavation and removal; earthwork, backfill, aggregates, stone and compaction; site pavement, rip rap, site restoration, loam and seed; utilities including plant chlorine contact tank foundation underdrain, water distribution, underground electric and underground chemical sleeve piping; chain link fences, precast concrete manholes, slabs, hatches, cast-in-place concrete, masonry, wood framed structures, metals fabrication, aluminum gratings and railings; rough and finish carpentry; damp proofing and insulation; roofing and siding; steel doors and hardware; windows, painting and all equipment including electric drive channel grinder, grit removal equipment, slide and sluice gates; magnetic and ultrasonic flow meters; vertical sewage pumps and controls; sump pump, hoists, pump station telemetry, gas monitoring equipment, process piping, fittings and valves; expansion joints, pipe hangars and supports; plumbing, heating, and ventilation; electrical wiring, conduit, controls, alarm and instrumentation systems; and all incidentals as required for the complete and full upgrade of the Davis Street Pump Station and expansion of the Wastewater Treatment Plant Chlorine Contact Tank.