The Contractor will furnish all supplies and equipment for accomplishment of all work. Contractor’s equipment shall be of the size and type suitable for accomplishing the various phases of work described and/or needed and shall operate from existing sources of the State furnished electrical power, water supply, etc., and shall have a low noise level of operation. Equipment considered by the Program Administrator (or their Designee) to be improper or inadequate for this purpose shall be removed from the work site and replaced by Contractor with satisfactory equipment. Materials and Supplies: The Contractor shall furnish: paper towels 2 ply toilet paper trash bags all liquid bathroom soap (for dispensers) urinal tablets PFAS free Shower Curtains All other materials and supplies must be provided by the Department. Fixture deodorant/ sanitizers or other odor masking materials are not acceptable and shall not be used. If such products are needed, then the area has not been cleaned and disinfected/ deodorized satisfactorily. Contractor must purchase products with the following recycled content: Toilet Paper with at least 20% post-consumer fiber Paper Towel with at least 40% post-consumer fiber Trash Bags with at least 10% post-consumer content unless products meeting or exceeding those recycled content goals are unavailable or cost greater than 4% more than equivalent products with lower recycled content. Pre and Polyfluorinated Substances (PFAS): MEARNG’s procurement preference is to avoid or minimize all other products with intentionally added PFAS. PFAS is commonly found in waterproof and/or stain resistant materials, floor waxes, furniture polishes, and paper products including toilet paper.