Specifications include, but are not limited to: Shreveport Regional Airport’s electronic security posture will be upgraded to include both access control and video surveillance components. Respondents should carefully review all SHV Security Systems Enhancements (SSE) design drawings and specifications to provide a detailed response and price to this Request for Proposal (RFP). The general scope of work is as follows: 1.2.1 Delegated Security Design Respondent shall include costs to further the security design to a 100% level for an Issued for Construction Set in AutoCAD and Portable Document Format (PDFs) to be provided by the Respondent for permitting process and subsequent construction. RFP Respondent shall also include costs for coordination with the SHV IT and Security departments. 1.2.2 Video Surveillance System The existing Pelco VMS and select video cameras shall be replaced at the airport, except where noted in drawings. This project will also include new video management software, servers and storage for the solution. The project will also include new control workstations and monitors. The camera replacement will take advantage of new camera technology to complement existing cameras and provide better situational awareness and provide greater fields of view. Furthermore, cameras will be expanded as noted in the drawings. The contractor will provide the airport with professional training for all VSS components and functionality for eight (8) individuals per SAA schedule. 1.2.2.1 VMS Software, Server and Storage Replacement. See initial design drawings and specification (SSI). 1.2.2.2 Select Camera Replacement Select cameras will be upgraded and transitioned to the new VMS. Cameras are shown in the initial design drawings and specifications (SSI). All cameras that remain as existing will be transitioned to the new VMS. The airport is prioritizing the reduction of downtime of cameras during the installation and transition. 1.2.2.3 New Camera Expansion Select cameras will be added to the new VMS. Cameras are shown in the initial design drawings and specifications (SSI). 1.2.2.4 Control and monitoring workstation and monitor replacement All monitoring workstations and large display monitors in the ACC will be upgraded. Locations are shown in the initial design drawings and specifications (SSI).