Specifications include, but are not limited to:. Must be able to begin project on Tuesday, September 29, 2020 absolutely NO EXCEPTIONS � North West Section � Section St next to stop sign at Chamber Building (sunken roadway) 6� x 20� 3� level � Oak St at Section St 70� x 6��3� and 8� x 10� 2� and road edge � Oak St at Richard RPD 8� x 20� 2� cap � 1013-A Section St (sunken roadway) 6� x 50� 2� level � 1004-A Section St (horseshoe on west side of road) 6� x 35� 2� level � 515 Martin Luther King (road edge) � Martin Luther King St at Malvern 8� x 20� 2� radius � Corner of Malvern at West �D� St roadway at stop sign (patch) 8� x 80� 3� road edge � ALL grudge ditch crossings *West Lessley St - 18� x 10� 2� level *West �A� School St � 18� x 10� 2� level 8� x75��2� cap *West �B� North St � 40� x 20� 3� cap � West Jeff Davis at Bella (road edge/radius) 25� x 6� 3� cap � West Harrop St. near new park (sunken roadway) 125� x 6� 2� cap � Kahn Street�west side of road edge near sewer plant (Joe Bob) 20� x 1� 2� patch � *Kahn St. from West Harrop to railroad (track repairs) 225� x 6��3� cap � North East Section � 1108 The Blvd (water leak � asphalt) 2� x2� 4� level � East Jeff Davis (one way at S curve) 20� x 20� 2� level � East Harrop between North Parkerson and Polk (edge of the road) 2� x 10� 2� level � N Eastern at Railroad tracks � east side (road edge) 6� x 30� 3� level � 508 N Eastern west side of road (sunken in � road edge) 2� x 10� 2� level Asphalt � N Polk at �A� School - corner at stop sign by funeral home (patch) 6� x 4� 4� patch � Windsor Pl to N Polk at East E (patch) 10� x70� 3� level � Corner of Lisa and B North intersection 6� x 12� 3� level � 617 East G St (road edge) 2� x 15� 3� level � 620 East F St north and south road edge 6� x 35� 2� level � 411 East E south end (road edge)