Specifications include, but are not limited to: One company shall be responsible for the installation of all aspects of the stage equipment. Work under this section shall include the furnishing of all labor, materials, tools, transportation services, supervision, etc., necessary to complete installation of new stage equipment. Alternate #1: Provide all fifty (50) Counterweight Sets Alternate #2: Provide New Stage Curtains -Front Curtain 2 Inherently Flame Retardant (IFR) 25 oz. Polyester Charisma Velour Color: TBD Top: Snap hooks Bottom: 6” chain pocket Pleats: box @ 12” o.c. Turn backs: 24” Fullness: 175% On existing track. -Side Legs 8 Inherently Flame Retardant (IFR) 22 oz. Polyester Satellite Velour Color: Black Top: Grommets/ties Bottom: 6” chain pocket Pleats: box @ 12” o.c. Side Hems: 3” Fullness: 150% On existing hardware. -Gray Traveler 2 Inherently Flame Retardant (IFR) 22 oz. Polyester Satellite Velour Color: Gray Top: Snap hooks Bottom: 6” chain pocket Pleats: box @ 12” o.c. Side Hems: 3” Fullness: 150% On existing track. There are presently fifty (50) double purchase counterweight rigging sets on the stage at Riverview Theater. Contractor is to replace ½ of these sets and install new hardware for twenty-five sets spaced front to back on the stage to hoist the stage curtains, lighting and scenery battens as prioritized by the owner. Counterweight Rigging (replacement hardware) 25 – 12” Upright head blocks 125 – 8” Upright loft blocks 25 - 10’ Double-purchase arbors with roller guides 25 – Rope locks (re-use existing locking rail assembly) 25 – 10” Floor blocks 125 – 30” trim chains 25 – 63’ long “ladder truss” style pipe battens Necessary quantity of 7 x 19 x ¼” galvanized aircraft cable Necessary quantity of ¾” synthetic Multiline II rope Necessary quantity of Nicopress sleeves, thimbles, and shackles Services include: 1.) Removal of existing hardware 2.) All labor for installation of new hardware 3.) All freight 4.) Four (4) hours of training on proper operation of rigging equipment