Specifications include, but are not limited to: The Consultant will be required to provide all necessary engineering and related services required for developing plans for the replacement of one bridge in Acadia Parish, which is off the State Highway System. The project number and modules required are as follows: PROJECT NAME RECALL NO. STRUCTURE NOS. MODULES REQUIRED SURVEY HYDRAULICS PRELIM. PLANS Nation Road / Coulee Duralde 200534 030130152921551 X X X TOPOGRAPHIC SURVEY (STAGE 3, PART Ia) This part of the contract shall consist of all land surveying services required to make a complete topographic survey for the proper design and layout of the project. The DOTD requirements which shall govern this survey are specified in the current edition of the DOTD Location and Survey Manual subject to the Off-System Highway Bridge Program Survey procedures. PRELIMINARY PLANS (STAGE 3, PART III) The hydraulic design of this site shall include viable drainage alternates. These hydraulic designs shall be reviewed and approved by the DOTD Hydraulics Section. The DOTD requirements which govern these designs are specified in the current edition of the DOTD Hydraulics Manual as modified by the Hydraulics Guidelines for Off-System Bridges. The approximate numbers of plan sheets required are as follows: DESCRIPTION NO. OF SHEETS Title Sheet 1 Typical Section 1 Plan/Profile Sheets: 1 (Rural - 1”=50’) (Urban - 1”=20’) Drainage Map 1 Construction Signing Sheet 1 General Bridge Plan Sheet 1 Cross-Section ERWK (Mainline) 5 (Stream) 1