Specifications include, but are not limited to: conduct pre-demolition asbestos surveys of the referenced buildings in accordance with New York State Industrial Code Rule 56 (NYS ICR 56) and 40 CFR 61, Subpart M - NESHAP. The inspection will include destructive investigative techniques to identify asbestos-containing materials (ACMs) to the maximum extent possible. The number of samples must be collected in accordance with industry standards including a minimum of 2 samples per miscellaneous material and analyzed in accordance with New York State protocols by a New York State ELAP approved laboratory. Reports will include the required information for a survey including the identification, locations, quantities and condition of ACMs.