Specifications include, but are not limited to: • Truck, Forklift and labor required to transport gypsum board from JPRD Maintenance Facility to Delta Playground and lift to 2nd floor. • Install and finish JPRD provided gypsum board on walls. • Provide and install painted walls. • Provide and install new 2 foot by 4 foot ceiling grid system. • Provide and install ceiling R-30 blanket insulation above ceiling grid. • Install JPRD provided ceiling tiles. • Provide and install new solid core door and frame that leads to Break Room. Re-use existing lockset. • Provide and install 5 mil vinyl plank flooring. Prep floor surface as required to provide a professional installation. (Type of flooring installed at JPRD Main Office)