Specifications include, but are not limited to: Provider shall provide Engineering Services to design an approximately 54-acre detention pond for the Goodbee Pond Project in Goodbee, LA (S8 - T6S - R10E,). The existing Tantela Ranch Road Regional Drainage Study prepared by N-Y Associates, Inc., dated August 2017 may be utilized. The pond is planned to be located northwest of the Spring Lakes Subdivision, between Tantela Ranch Rd and LA Hwy 1077 within the Tchefuncte River watershed, on undeveloped land, if possible. The pond design shall include any immediate downstream or upstream drainage improvements as necessary to facilitate connectivity to the pond, which may include, but is not limited to cross drains, side drains, storm drains, and ditches.