Specifications include, but are not limited to: 3) Work will begin with the series of electrical panels on the South end of the building. This work must be completed in 3 days and cannot be performed during a rain event. SWBNO will provide an electrician to engage lockout/tagout prior to commencement of this work. 4) Containment set up must be completed in 1 Day for Electrical Panel Cleaning. 5) Cleaning of the area and encapsulation must be completed in 1 day for Electrical Panel Cleaning. 6) Clearance sampling must be completed in 1 Day with samples driven to CA Laboratory in Baton Rouge with Same-Day Turnaround for Electrical Panel Cleaning. 7) All surfaces within the building shall be HEPA vacuumed and wet-wiped to remove all surface contamination and asbestos residues. 8) If the SWBNO needs any equipment (drums, dollies, hand pumps, etc.), Contractor will be responsible for pre-cleaning the equipment for SWBNO use and moving the equipment outside of the containment area. 9) Isolate all work areas using required signs and barrier tape. 10) Contractor shall construct a rigid three (3) chamber decontamination unit, as defined by applicable regulations, to provided access and egress to the work area. The decontamination chamber shall be accessible to all employees working within contained areas.