Specifications include, but are not limited to: • Soil and hydrologic testing must be conducted. All GI installations should be designed to retain/detain and filter the first one and one quarter (1.25) inch of stormwater runoff during each rain event, at a minimum. • Preliminary Schematic Design: Drawings with site dimensions and proposed catchment area dimensions. Include a context map of proposed site in relation to neighborhood/city. • Include features for: ▪ Water quality and quantity monitoring plan (devices such as flow meters and probes should be installed). ▪ Signage and/or educational component using new technologies. ▪ Refuse management (trash receptacles and assignment of responsibility for trash receptacles). ▪ Traffic mitigation: if necessary, include a plan to protect the site and deter vehicular traffic from entering the site. • Final design: Pre-construction conference with SWBNO. Final plans should be easily adapted to other locations.