Laboratory Material Testing of standard DOTD testing; when testing is non-standard, the Consultant will be responsible for third party testing, and coordination/reporting of that testing with DOTD. Access to project plans and contract proposals. Oversight of all shop fabrication inspection to be performed by the DOTD structural/marine fabrication engineer. Review and approval of project shop drawings generated by the Contractor that aren’t typically reviewed by the project engineer. Boring and CPT data, and pile order lengths. Traffic data, if required. Copies of necessary construction contracts, and copies of construction plans. The Consultant provided personnel will be responsible for obtaining all DOTD forms, manuals, documents, and procedures which are available on DOTD’s internet site. Copies or make available all necessary manuals, documents, forms and procedures not available on its internet site. Office space and field office space, as available.