600 kw Diesel Generator with Level 1 Enclosure, 72 hour tank, 2,000-amp transfer switch, delivery, start up, owner training and two-year warranty Demo the Parking Lot for the Footprint of the Generator and Pour Engineered Concrete Pad Install the Generator with Bollards Every 6' in the Parking Spots Closet to the Cleco Power Pole Install the New Transfer Switch Beside the Secondary Pick-Up Pole. Install Underground Conduits and Wiring from the Switch to the Generator and From the Switch to the Cleco Pole Intercept the Conduits and Wiring at the Pickup Pole and Extend to the New Switch on a Saturday. Shall Include Option to Have a Temp Generator Onsite. Install Conduit and Wiring from the Generator to the Nearest 120 Volt Panel for Battery Charger and Block Heater Track hoe, Crane, Trenching, and Backfilling