Specifications include, but are not limited to: 1.0 Snow and Ice removal and pretreatment for 2022/2023 Season through the 2026/2027 In general, the selected Contractors shall be required to provide all management, tools, supplies, equipment, vehicles, and labor necessary to perform the required service twenty-four (24) hours a day, seven (7) days a week. Equipment will need to be submitted for approval to ensure proper attachments to avoid damage to roads.; 2.0 The intent of this contract is to combat adverse weather conditions in a comprehensive, proactive, and orderly manner that results in a high level of quality and safety for the City of Shreveport public.; 3.0 Given that each storm is different in terms of starting time, temperature, precipitation rate, accumulation, and duration, the Contractor will need a Project Management Plan in place that is able to provide the best approach for dealing with various types of storms. The Contractor shall be required to provide services, for a base year and four (4) additional option years. The months of service include, but are not limited to, October through April. Snow blow/plow and salt all roadways prior to 7:00 a.m. on weekdays Proposal must include public sidewalks.