Provide all labor, parts, tools, materials and equipment to inspect the Aqueous Film Forming Foam (AFFF) Systems in the AASF #1 & C-12. Description Of Work: 1. Contractor will inspect the Aqueous Film Forming Systems in accordance with UFC 3-601-02 Change 1 dated 18 April 2025, NFPA 11 and NFPA 16. The system requires a 2 Year Year inspection in accordance with UFC 3-601-02, Table 2-18 and NFPA 25 and NFPA 750. Contractor will test the system with simulated test liquid in lieu of system’s AFFF foam concentrate. The recommended simulated test liquid is Planit Safe 3%Test Liquid by Vector Fire Technology, Inc., or it’s equal. This material is cost effective and safer to use. 2. Approximately 15,000 to 20,000 gallons will be flowed through the valves in the system during the test procedures. The discharge through the valves will be considered wastewater and must be captured and disposed of in accordance with all state and federal regulations. The owner will be provided with all legal documents pertaining to the disposal to verify proper disposal.