DRYDOCK FOR USCG EXAM AND OTHER MAINT & REPAIRS The following scope of work describes the separate items required to be done to the vessel during this modification. It is to be understood by the Contractor that the following applies to each and every item unless specially noted otherwise. The Contractor is to provide all labor, material, special equipment, make all removals and restorations, remove and replace interferences and rig and unrig as found necessary in the course of accomplishing the following work items, unless excluded in a pay item (i.e. Miscellaneous Steel Repairs). The Contractor shall make all disassembles and subsequent reassembles to accomplish the following work items. The Contractor shall provide a safe place when the vessel is secured to the dock to prevent damage. The Contractor may reference the pictures & sketches referenced in the pay items for general information and to illustrate the intent and conceptual guidelines regarding the specific work items. The Contractor is solely responsible for determining the accuracy of any of the information contained therein