0001 203-01-00100 General Excavation 239.000 CUYD Dollars Cents 0002 203-07-00100 Borrow (Vehicular Measurement) 101.000 CUYD Dollars Cents 0003 401-02-00100 Aggregate Surface Course (Adjusted Vehicular Measurement) 185.000 CUYD Dollars Cents 0004 502-01-00100 Asphalt Concrete 1,947.300 TON Dollars Cents 0005 502-01-00200 Asphalt Concrete, Drives, Turnouts and Miscellaneous 117.100 TON Dollars Cents 0006 509-01-00100 Milling Asphalt Pavement 17,105.000 SQYD Dollars Cents 0007 509-02-00100 Contractor Retained Reclaimed Asphalt Pavement -950.000 CUYD 0008 510-01-00200 Pavement Patching (12" Minimum Thickness) ROADWAY 100.000 SQYD Dollars Cents 0009 510-01-00200 Pavement Patching (12" Minimum Thickness) SHOULDER 2,900.000 SQYD Dollars Cents 0010 713-01-00100 Temporary Signs and Barricades LUMP SUM Dollars Cents 0011 713-02-00300 Temporary Pavement Markings (8" Width) 213.000 LNFT Dollars Cents 0012 713-02-00500 Temporary Pavement Markings (24" Width) 66.000 LNFT Dollars Cents 0013 713-03-01000 Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 1.422 MILE