Inspection to be completed during the months of February and March every year and vendor must have agency staff sign off on completed job. Upon completion of the inspection, vendor is to provide a detailed report, including but not limited to sensitivity results, any system deficiencies, as well as recommendations for repairs. The report is to be completed and given to the agency within two weeks of the completion of annual inspection. Brand of smoke detectors: -Silent Knight -Notifier -Edwards Detectors are located throughout the prison at the following locations: * Camp-C * Camp-D * Camp-F * Camp-J * RC/Admin. * Main Prison Office * TU * Canteen Warehouse * Training Academy * Hospital * Fire Station * BOQ -1, 2 & 3 * Chapels located at Camp C, D, F, main prison, interfaith, & B-line * Main prison education building * Main prison cellblocks (5 total) * Main prison dorms (8 total) * New death row * Old Admin. building/ Control Center * Main Prison Kitchen * Main Prison Maintenance * Mattress Factory * Main Prison A building Testing to be done per National Fire Protection Code 72 (NFP-72) Equipment to be tested as follows: (numbers are approximate) See attached equipment list - Fire alarm panels: 65 - Smoke detectors: 2625(both photo and ion type) - Pull stations: 287 - Duct detectors: 138 - Speakers/strobe/horn: 1406 - Cerberus pyrotechnics panels: 4 - Heat detectors: 101 - Voice Eva. Systems: 5 - Power supplies: 45