Specifications include, but are not limited to: This project consists of exterior waterproofing to replace all exterior joint materials including all window gaskets, replacement of roofing, garage traffic coatings, fluid applied waterproofing, worn entry hardware, repairs to failing flashing and parapet caps, damaged upper level concrete masonry unit walls, and to perform cleaning on the 599,158 s.f., 7 story LaSalle Parking Garage. The LaSalle Garage will remain in full operation during design and construction, with construction phased so as to make minimal impact on the tenants. The Designer will develop preliminary phasing diagrams in the construction documents that are to be finalized with input from the Contractor who is awarded the work. The selected Designer will be required to acquire recognized accreditations for working from a swing stage, including Fall Protection Authorized Person training (ANSI/ASSE Z359.2, Section 3.3.6.3) and training on the actual certified fall protection system utilized by the Contractor. Designer is encouraged to hold certification for Fall Protection Competent Person ANSI/ASSE Z359.2, Minimum Requirements for a Comprehensive Managed Fall Protection Program. The Designer will conduct at least two comprehensive field inspections for each swing stage drop, plus final inspections as required to verify Contractors performance. Design services and fees are based on and limited to Program Completion through Construction Document Approval (60%). At the Owners option, the contract may be amended to include additional phases with the corresponding fee adjustment. The Designer shall prepare and submit all required drawings to Facility Planning & Control in AutoCAD and hard copy. Drawings shall follow the format specified in the Instructions to Designers for AutoCAD Drawings Submittal. The available funds for construction (AFC) are approximately $1,690,500.00 with a fee of approximately $71,682.00. Contract design time is 180 consecutive calendar days; including 45 days review time. Thereafter, liquidated damages in the amount of $125.00 per day will be assessed. Further information is available from Matthew Baker, Facility Planning & Control