Building 6, 2nd and 3rd floor (four on the 2nd floor and four on the 3rd floor) 1. Demolition and Site Preparation The Agency shall be responsible for the removal of all existing walls to provide access for plumbing work. The Contractor shall ensure that the work area is safe and clearly marked to minimize disruption to building occupants. 2. Plumbing Work The Contractor shall re-plumb the restrooms in compliance with ADA standards, utilizing the existing pipe chases. All plumbing work must meet local building codes and regulations. 3. Installation of Fixtures The Contractor shall purchase and install new ADA-compliant toilets and sinks in all eight restrooms. Fixtures must meet all ADA accessibility requirements, including height and clearance specifications. 4. Wall Replacement After plumbing work is completed, the Agency shall be responsible for installing blocking for grab bars to meet ADA requirements and constructing a new wall for this purpose. 5. Cleanup and Maintenance The Contractor shall be responsible for maintaining a clean work environment throughout the duration of the project. All debris and materials must be properly disposed of in accordance with local regulations by the Contractor. 6. Timeline and Communication The Contractor shall provide a detailed timeline for the project, including key milestones. Regular communication with the Agency is required to ensure all work is progressing as planned and to address any issues that may arise during the project.