Specifications include, but are not limited to: The Work shall include interior reconstruction of living units damaged by August 2016 flood event. Demolition work shall include removal, remediation and disposal of existing gwb ceiling (w/ trace asbestos in texture & drywall compound) and existing above ceiling loose fill fiberglass insulation. This work shall be bid as a Unit Cost item on a per living unit type basis (Types of living units include: 1 bedroom living unit, 2 bedroom living unit, 3 bedroom living unit, 4 bedroom living unit). Construction work shall include, but is not limited to, new exterior wall and ceiling insulation (including closed cell spray foam insulation @ exterior walls up to 4'-0" above finish floor), new gwb on all interior and exterior walls and ceilings, new (replacement) central HVAC system including ductwork, new VCT flooring, new wood baseboards and shoe mold, new interior and exterior doors and frames and interior door hardware (exterior door hardware shall be salvaged and re-used), including casing trim, new window sill and stool trim, new alum storm doors, new plumbing fixtures , new PE hot and cold water piping, new kitchen base and wall cabinets and countertops, new bathroom vanity base cabinet and countertop, new synthetic marble tub/shower surround & Bathroom wet wall wainscot, new electrical devices and wiring back to, and including, new electrical panel, new light fixtures, and painting.