Specifications include, but are not limited to: The Contractor will remove all existing cameras and including mountings and brackets back to the existing rack in the Communications Room. The Contractor will test all existing cables that are shown to be reused and in addition, will provide new cables for all cameras which are being installed in new locations. The Owner will replace all ceiling tiles that are effected at the demolished camera locations with new ACT. The Contractor will patch and repair effected walls and ceilings in the area of work where demolition occurs. Owner to paint. The project consists of proving all labor and materials for the complete installation and commissioning of a comprehensive video and audio surveillance system including a monitoring workstation consisting of a networked CPU tied to a large screen color monitor located within the facility. All cameras shall be high definition IP Network based with IR capabilities and will be integrated with audio detection. All camera cabling shall be Cat 5E plenum rated data cables in order to match existing stock. The Contractor shall provide a Security Camera Network using fiber optic servers, NVR video recorders, and POE switches located in a floor mounted equipment rack. The Owner will provide the UPS in the rack. The video storage capability shall be four weeks minimum using the storage and memory sizes as specified. The Contractor shall provide the Owner with camera license software modules using password protection access. Clarify that the work is to be conducted on the site of School Aged Male and Female Students who learn, play, sleep and reside at this facility, and will remain occupied during the entire contract period. Work to be performed within the facility is to be coordinated with the Owner's Representative (Superintendent or Maintenance Supervisor) on a daily basis. All work shall be done in compliance with the KBC "Kentucky Building Code", the IBC "International Building Code" and NEC "National Electrical Code".