Specifications include, but are not limited to: Phase I opened the drainage channel and replaced the damaged culvert at the Danny Collins residence. The remaining slide material will be removed and transported to the previously used waste area, 3 Wildlife Accessible Portal Closures will be constructed, and combination rock ditch drain will be constructed in front of portals for drainage. A Class II ditch will be constructed to connect existing Class II ditch and drainage from portals, and repair public roads with DGA, roadway stone and blacktop. Silt Barrier-Bales & Fence is proposed for proper silt control at the Danny Collins site. Silt control at the waste area will be provided by diversions and ponds constructed as part of the Carr Fork Development mine plan.