Specifications include, but are not limited to: The project involves site preparation in order to install a doser such as the Aquafix Lime feed system or equivalent with variable speed electrical drive and a 30 ton capacity lime storage silo. The system will inject pebbled quick lime lime into the center of the stream channel by an extended screw auger tube. The system will be protected by a structure as designed by the doser unit manufacturer. The system will be set up on a 20' x 20' concrete pad and access to the site will be provided via a 400 LF, 20' wide gravel road. Power to the site will be installed from the main line along W Gamblin Cemetery Road. The meter will need to be set outside the main gate to allow access to the meter.