Specifications include, but are not limited to: •Construction work: oEngineering Control and Layout oConcrete Cure Boxes per ASTM C31. The project will provide electric and a safe location for which cylinders can be placed. oInstallation of materials and equipment as indicated in the project documents oCorrective work due to failed inspections oMechanical, Electrical, Plumbing, and Fire Protection; testing/balancing and commissioning oLandscaping and IrrigationoSpecialty Finishes•Preparation of Radiological Work Permits•Surveying •Mechanical systems and piping (including line plugging) testing•Electrical systems tests•Radiological or chemical contamination tests•Review, audits or corrective actions regarding Construction Manager’s document control, engineering procedures or design control processes.