Specifications include, but are not limited to: construction and installation of two bridges; one extending from the Newport flood levee to the eastern side of the Taylor Southgate Bridge, and one extending from the Newport flood levee to the western side of the Taylor Southgate Bridge. General site work includes demolition of existing concrete, asphalt and existing lighting, erosion control, and miscellaneous fencing, amenities, lighting and pavement installation. Work for the West Bridge includes earthwork, fabrication and installation of truss bridge and associated bridge deck, construction of retaining walls and other modifications. Work for the East Bridge includes structure excavation, fabrication and installation of truss bridge and associated bridge deck, piering and footing construction and other modifications. In addition to the required Bid List, a schedule and fee proposal for Construction Inspection Services and Geotechnical Inspection Services are to be included in this response. All work must be completed in conformance with USACE and KYTC approved designs.