Specifications include, but are not limited to: (1)Submittals shall include the following: a.Dimensioned plan and elevation view drawings, required clearances, and location of all field connections b.Summary of all auxiliary utility requirements such as electricity, water, etc. Summary shall indicate quality and quantity of each required utility. c.Single line schematic drawing of the field power hookup requirements, indicating all items that are furnished. d.Schematic diagram of control system indicating points for field interface/connection. e.Diagram shall fully delineate field and factory wiring. f.Installation and operating manuals. (2)Review the Controls Section of these Specifications (if applicable) to determine controls to be furnished by the equipment manufacturer, if any. The Contractor shall provide all controls with equipment unless specifically listed otherwise. (3)Insure that the equipment which you propose to furnish may be installed, connected, placed in operation and easily maintained at the location and in the space allocated for it. (4)Determine from the Bid Documents the date of completion of this project and insure that equipment delivery schedules can be met so as to allow this completion date to be met. (5)Where manufacturers’ temperature controls are specified, they shall be in full compliance with International Mechanical Code Section 606 including automatic smoke shut down provisions.