Specifications include, but are not limited to: 2. Construct access road to tank facility as directed by the Inspector and in consultation with landowner. All trees, brush and surface debris shall be removed from the site as directed. 3. As shown on the attached Project Sketch for each site, an estimated amount of oil/brine contaminated soil will need to be removed for proper disposal at an approved landfill location. All material leaving this site must be properly documented, and a complete manifest for each Load shall be provided to the Division before completion of the project. Cleanup is to a visible standard, no sampling required. 4. Secondary examination for oil contamination shall be done by the contractor using shovels to penetrate a minimum of 12 inches around valves, load-out points and f]ow line connections. Contractor should validate impacted soil contamination areas as identified during the Initial Site Assessment and shown on the Project Sketch, and clearly delineate with the onsite inspector for approval if any additional areas of concern are identified as requiring removal.