Specifications include, but are not limited to:COUNTY - BOYD: Except as specified herein, perform all work in accordance with the Department’s Standard Specifications, Supplemental Specifications, applicable Special Notes and Special Provisions, and applicable Standard and Sepia Drawings, current editions. Furnish all materials, labor, equipment, and incidentals for the following work: 9-9007.10: US 60 @ Ramey St. Traffic Signals: Remove Signal Equipment involves the removal of the signals heads facing the US 60 approaches (four 3 -section and two 4 -section signal heads). Install necessary signal cable to install new pole -mounted -section signal heads facing the US 60 approaches, -section flashing yellow arrow signal heads for each US 60 left turn lane, and section “dual red head” signal heads for each US 60 thru lane. All new signal heads shall have reflective backplates and LED indications. Refer to the plans for additional details. 9-9007.50: US 23X @ 10th St. Reconfigure US 23X (Winchester Ave.) from Four to Five Lanes: The intent of the Winchester Ave project is to reconfigure the roadway to a five lane section between 12th Street and Greenup Ave. Additionally, a SB Pull Off Lane and a NB Parking Bay will be constructed between 9th and 10th Street. This work will include earthwork, placement of DGA, placement of asphalt base, placement of an asphalt surface overlay , construction of sidewalks, and the application/installation of pavement markings. Refer to the plans for additional details.