Specifications include, but are not limited to: The project involves the complete removal of the existing air handler units and outdoor condensing units heating and cooling the bldg. This will include removal of the existing indoor and outdoor units and their controls, also a new VRF system to air condition the Drill Hall and locker rooms is to be included under the Add Alternate #1. This contractor will need to make all of the control wiring interlocks between indoor and outdoor equipment for control plus all T-stats. This project also has a DDC control allowance of $70,998.00 to interface all of the existing and new HVAC equipment, also a $3,000.00 allowance for Add Alternate #1 for adding the HP-3 system to the Drill Hall and locker room to the DDC system.