Specifications include, but are not limited to: The successful firm shall evaluate three (3) predetermined sites for replacing Fire Station #2 and provide a preliminary site plan design for each site, which shall be based on HFD’s communicated needs for Fire Station #2 ; The successful firm shall determine whether it would be more economical/practical to keep the existing structure or to demolish it based on its condition as well as HFD’s communicated needs for Fire Station #1. ; • Consult regularly with city personnel to define all design elements for the new fire station during the design process • Conduct an appropriate geotechnical investigation • Prepare necessary surveys, topographic mapping, and inspection services