Specifications include, but are not limited to: Provide a description of the proposed System components to include but not be limited to: Anticipated number and general location of small cell Antennae; Location (aerial/underground) of fiber. Where possible, provide estimated percent aerial and percent underground; Anticipated ground level elements (GLE’s) and general locations. For underground fiber installation, discuss proposed installation methodologies. The narrative shall address compliance with FCC standards as related to applicable equipment such as small cell Antennae and current acceptable RF design standards currently in practice as well as to those standards found in the Public Works and Assets Utility Policy, latest revision. Discuss anticipated project phasing based on geographic and/or right of way limitations, limitations imposed by local events and those internal limitations affected by finance and project logistics.