Specifications include, but are not limited to: Reclamation work consists of construction of a reinforced concrete wall stabilize a slide behind the resident's garage. Subdrain and ditch work will be installed to direct the water away from the slide and eventually outlet into Callahan Branch. All waste from the project site will be disposed of either onsite or at the waste area off US 119. During the process of these construction activities, no trees over 5 inches in diameter at breast height will have to be removed in the AML problem area. A sediment and erosion control program, consisting of such measures as constructing hay bales/silt fence to be maintained throughout the life of the project and prompt re-vegetation using agricultural limestone, fertilizer, seed, and mulch will be implemented on all areas disturbed by this project.