Specifications include, but are not limited to: This project involves the replacement of all three existing boilers and the addition of one new feed water deaerator at the Central Utility Plant serving the Centralized Laboratory Facility, Frankfort KY. The new boilers will be dual-fuel, 150 psi steam, scotch marine type, two 600 BHP and one 300 BHP, replacing units of similar sizes to be demolished. The new deaerator and feed system will be sized to accommodate all three boilers and an existing deaerator will be relocated for continuing service. All required new and reconnected piping, stack work, electrical service and controls for a complete working system must be provided. The project includes demolition of an existing free-standing office area inside the boiler room, existing pads and some remaining coal-handling equipment, as well as considerable new concrete work for pads and the infill of abandoned coal storage and basement machinery spaces. The boilers will be replaced sequentially, to avoid significant interruption of steam service to the Central Lab. Also included is an additive Bid Alternate for stack economizers on the larger boilers.