This project consists of the removal and replacement of existing roof systems on 5 separate buildings. All areas are to be demolished down to the existing roof decks and replaced. New shingle roofs will be applied to buildings 20 & 78; new 2-ply modified bitumen membrane roofs will be applied to buildings 31, 33, & 48. New Shingle rooves will have ice & water at all penetration flashings & at area perimeters which shall extend over rakes & eaves. All new metal flashings & edging will be of pre-finished material. New 2-ply mod-bit rooves will be over 2 layers of 2.2 rigid insulation & cover board. Tapered insulation shall be used at all drainage crickets & saddles. New coping cap, expansion joint, & control joint flashings shall be pre-finished metal and installed at existing locations. New waterheads, downspouts, & splash pans/splash blocks shall be provided where downspouts do not empty into drain boots.