DGA BASE 960.00 TON; LEVELING & WEDGING PG64-22 531.00 TON; CU ASPH SURF 0.38D PG64-22 6,515.00 TON; TEMPORARY SIGNS 420.00 SQFT; MAINTAIN & CONTROL TRAFFIC (KY 107) 1.00 LS; MAINTAIN & CONTROL TRAFFIC (KY 181) 1.00 LS; MOBILIZATION FOR MILL & TEXT (KY 107) 1.00 LS; MOBILIZATION FOR MILL & TEXT (KY 181) 1.00 LS; ASPHALT PAVE MILLING & TEXTURING 470.00 TON; EDGELINE RUMBLE STRIPS 72,748.00 LF; PAVE STRIPING-TEMP PAINT-4 IN 40,000.00 LF; PAVE STRIPING-PERM PAINT-6 IN 157,000.00 LF; PAVE MARKING-THERMO STOP BAR-24IN 12.00 LF; PAVE MARKING-THERMO CROSS-HATCH 200.00 SQFT; PAVE MARKING-THERMO CURV ARROW 6.00 EACH; FUEL ADJUSTMENT 10,189.00 DOLL; ASPHALT ADJUSTMENT 25,592.00 DOLL; PAVEMENT MARKING-THERMO LETTERS (SLOW) 8.00 EACH; ASPHALT MATERIAL FOR TACK NON- TRACKING 46.00 TON...