Specifications include, but are not limited to: 1. Contractor is responsible for a pre-bid site visit to verify existing conditions. 2. Full Depth repairs. a. Sawing using a diamond blade in straight lines along existing paving is by contractor. b. Area by dumpster in main park is marked for full depth repair (area in bend damaged by dumpster truck). All edges will be sealed using edge sealer. c. Surface installed within 48 hours of base installed. d. 6” excavation is the depth for full depth repairs. e. 4” compacted base (type 303) for full depth repairs. f. 2” Surface installed over base 448 type 1 surface mix. g. All spoils to be hauled off county property away by contractor. h. Price per ton installed shall include all incremental costs of sawing, haul away off county property, sealing and other costs. i. Provide price for DGA installed per ton if needed to bring sub-base to appropriate level if needed. j. All project sites to be kept clean and swept.