Specifications include, but are not limited to: This invitation is for the renovation for Rowlette Building as specified in the following bid at Eastern Kentucky University’s Richmond, KY Campus. The work includes furnishing all labor, materials, equipment and services necessary for the complete project; 1. Remove all VCT, Carpet and tile Repair and polish concrete in these areas to a gloss finish. (Except in the Records Room will be LVP) 2. Remove all tile from walls in ½ bathrooms 8 total approx. 4’ high on every wall. Toilets and sinks will have to be removed and replaced. Repair walls, if they can be repaired, if not, replace damaged dry wall to finish for paint. EKU representative will help in determination if repairable. 3. Remove all tile from walls in bathrooms in waiting area 2 total approx. 4’ high on every wall. Toilets and sinks will have to be removed and replaced. Repair walls, if they can be repaired, if not, replace damaged dry wall to finish for paint. EKU representative will help in determination if repairable. 4. Room labeled Treatment. Remove all wall and base cabinets including countertop and sink. Repair any wall damage to be painted. Include double box GFCI Outlet Receptacle above countertop. Replace base and wall cabinets on the 87” wall. To include: 36” Maytag 24.9-cu ft Side-by-Side Refrigerator (Fingerprint Resistant Stainless Steel), 36” sink base Diamond NOW Wintucket 36-in W x 35-in H x 23.75-in D Cloud Gray Sink Base and 12” Diamond NOW Wintucket 12-in W x 35-in H x 23.75-in D Cloud Gray Door and Drawer Base.