Specifications include, but are not limited to: The project consists of an interior renovation of the existing building. The renovation will include the demolition and reconstruction of new latrines. A portion of exterior wall will be demolished and rebuilt up with similar type construction for stability. Blast rated storefront, all doors and windows throughout the building are to be replaced. Roller window shades will also be installed in occupied window spaces (offices, classrooms). New hollow metal doors, frames, and new door hardware. Interior finishes including ceiling grids, wall paint, ceramic tile, and carpet are to be replaced as well as concrete floors to be polished and refinished. Spaces will be renovated and placed into existing spaces ie. Computer lab, classroom, platoon leader office, and recruiter office to accommodate needs of the unit. Structural repairs and remediations will occur throughout the building. Installation of storage lockers is included in the project. Improvements to building mechanical systems including plumbing, heating, ventilation, and air conditioning. Renovations to building electrical systems including power, lighting, communications, safety, and overall security systems. Project includes the replacement of (3) existing HVAC split systems with the addition of a new split system. Air handlers shall have new controls installed. All plumbing fixtures in the main restrooms will be replaced and a new natural gas fired water heater will be added to serve the new showers. The building will receive new data wiring throughout due to the relocation of the existing I.T. room. LED light fixtures will take the place of existing fixtures in a one-for-one replacement renovation throughout the entire building, including exterior lighting. New light fixtures will be installed in the new restrooms and computer lab areas.