Specifications include, but are not limited to: o All gravel driveways shall be tapered in with asphalt as needed for a smooth vertical transition. All concrete and asphalt drive ways shall be keyed in for a smooth transition. Requirements for bidding (These requirements become part of the contract for the successful bidder): Project Scope: o By making a bid, the applicant stipulates that they have visited the site and have an understanding of the scope of work and have field verified the scope. o All roadway area shall be thoroughly cleaned before applying tack coat and laying the overlay. Tack coat shall be applied so that it results in complete coverage of the pavement to be overlaid without pooling. o All water valves, gas valves, manholes, etc. shall be raised to the level of the new pavement. o Where existing pavement is to be widened, the existing pavement will be saw cut completely through to ensure a good, clean and stable joint. o All paving (overlay) shall include courses required to crown the centerline of the road for positive drainage. Minimum crown shall be 1/8 of an inch per foot. All overlays must be at least 1.5” thick surface.