1. The Contractor shall provide four (4) custom indoor batting tunnels and one (1) divider net that are all automated and vertically retractable in the softball training area. This includes all electrical components, switches, winches and conduit to make the system operable as well as all supplementary support structure. 2. The batting tunnels shall be approximately 15’Wx17’Hx65’L with 4’Wx13’H openings for access. Access areas shall be able to be closed when tunnels are in use for safety. The successful Contractor will be responsible for field verifying these measurements with the Owner. Any/all tubing frame shall be powder-coated steel. The scope of this turnkey project includes but not limited to all mounts, cabling, hardware, and netting (no existing netting will be used). 3. The netting should be no less than #60 net. The Contractor shall be responsible for proposing a gauge netting that allows for safe use when all four (4) tunnels are in use. 4. The successful Contractor shall provide a set of record drawings and as-builts for UK Records. 5. Material or equipment required for the provision and installation of the netting system that are not expressly addressed in the RFP is understood to be the responsibility of the Contractor...