Description: The project consists of the rehabilitation of six (6) 60-inch by 72-inch sluice gates located within the ORPS1 wet well. The work will be completed in three sequential phases. Each phase will include: • Installation of two (2) owner-provided temporary steel bulkheads. • Isolation of one (1) wet well cell. • Rehabilitation of two (2) sluice gates within the isolated cell. This process will be repeated for each of the three (3) wet well cells until all sluice gates have been rehabilitated. The cells will be isolated one at a time to allow the existing sluice gates to be removed, cleaned, inspected, rehabilitated, and reinstalled and for NKWD to perform maintenance. ORPS1 is located at 200 Mary Ingles Highway, Ft. Thomas in, Campbell County, Kentucky.