The New Phased Harrison County High School Phase 2 project will be for the construction of a new 216,300 SF two story building constructed of Insulated Concrete Form (ICF), Structural Steel, Reinforced Concrete Block, Aluminum Storefront and Curtainwall Systems. The exterior envelope materials consist of a combination of utility size brick veneer, calcium silicate full bed building stone, cast stone, glass fiber reinforced concrete (GFRC) and an EPDM Roof System. Interior materials consist of a combination of Terrazzo, Wood Sports Flooring, Luxury Vinyl Tile Plank, Ceramic Tile and Resinous Flooring. Ceiling systems will include Suspended Acoustical Baffles, Suspended Acoustical Ceiling Tiles with the primary system being exposed painted structure.